
Paving contractor · South Shore
Asphalt paving on the South Shore.
Driveways, repairs, sealcoating and parking lots in Longueuil, Brossard, Boucherville, Saint-Lambert, Saint-Bruno-de-Montarville, Sainte-Julie, Varennes, La Prairie, Candiac, Saint-Constant, Chambly and Châteauguay. City rules change from one municipality to the next: here is, for each one, what it takes to redo or widen your driveway, and the 2026 price.
- Free quoteWe come take a look, no obligation.
- Clear priceEvery step spelled out in the quote.
- Hot asphaltLaid with a paver, rolled.
- Quick callbackThe owner, not a salesperson.
On this page
- The cities we pave on the South Shore
- Asphalt paving prices on the South Shore in 2026
- Redoing or widening a driveway: each city’s rules
- Winter on the South Shore: 73.7 to 85 freeze-thaw days a year
- Tempo shelters on the South Shore: 2026–2027 dates
- Our services on the South Shore
- Frequently asked questions
- Sources
The cities we pave on the South Shore
- Longueuil
- Brossard: redo with no paperwork, widen before September 15
- Boucherville: 40% of the front yard, 7 m of access
- Saint-Lambert: a 6 m curb cut, $200 a metre of curb, no Tempo shelters
- Saint-Bruno-de-Montarville: 7 m at most, and half the frontage
- Sainte-Julie: a 7.50 m curb cut, and shelters 3 m from the curb
- Varennes: curb cuts from April 15 to November 1
- La Prairie: redo with no permit, widen with a certificate
- Candiac: a certificate for the driveway, and no Tempo shelters
- Saint-Constant: 3 m in front of the house, a 7 m driveway
- Chambly: the width follows the lot frontage
- Châteauguay: a permit to enlarge, 50% of the frontage
Asphalt paving prices on the South Shore in 2026
| Work | 2026 prices (before tax) | 400 ft² double driveway |
|---|---|---|
| Fully rebuilt driveway (excavation, base, asphalt) | $6–10/ft² | $2,400–4,000 |
| Resurfacing over a sound base | $3–5.50/ft² | $1,200–2,200 |
| Sealcoating | $265–300 up to 600 ft² | $265–300 |
| Hot-poured crack sealing | $250–400 below 200 linear feet | depends on length |
Calculate your price in 30 seconds or see all 2026 prices.
Your driveway on the South Shore: free visit and quote
Redoing or widening a driveway: each city’s rules
| City | Redo the driveway at the same size | Widen the driveway | Curb cut | Maximum width |
|---|---|---|---|---|
| Longueuil | Not a listed trigger in the by-law (confirm with 311) | Certificate ($136); about 8 weeks | City contractor: $226 up to 4 m | The lesser of 7.5 m and 50% of the lot |
| Brossard | No certificate for a 1–3 dwelling home | Authorization (not a permit), to request before September 15 | The City: $60 + $48.95 per metre (4 m minimum), plus restoration | Curb cut 10 m and at most 50% of the lot width |
| Boucherville | No certificate for a house’s parking (only for multi-unit buildings, integrated projects or businesses) | No certificate for a house, but the curb cut must first be approved by the permits department (answer in at least 7 business days) | The City or its contractor, at the actual cost of the work, billed to the owner | Access 7 m at most, measured at the front lot line and at the lowered curb; one access if the frontage is under 30 m |
| Saint-Lambert | A separate permit is required if you change the parking area | Curb-cut construction or modification request to Urban Planning, on top of the parking permit | Work done by the City: curb sawing $200/m, curb rebuild $360/m, sidewalk rebuild $600/m (free when the City rebuilds the street) | Curb cut 2.5–6 m (two combined: 9 m on a lot 24 m wide or more); 1.22 m clear between a walkway and the parking if not combined |
| Saint-Bruno-de-Montarville | By-law URB-ADM2017 (s. 74) covers laying out or redoing parking: we check with the City whether a certificate applies | Same steps; one driveway if the lot is 30 m wide or less, two beyond, 8 m apart | Curb lowered over the full driveway width; steps to confirm with the City | Driveway 3.5 to 7 m, not more than half the front lot line (7 m allowed if the garage is under 6 m from the street) |
| Sainte-Julie | No certificate for exterior work at an H1 or H2 house (except PIIA) | No certificate for the house; the curb cut is paid to the City, in advance | Curb or sidewalk work billed by the City per its fee schedule, payable in advance | Curb cut 3–7.50 m, matching the driveway width; 7 m between two; 6 m from an intersection |
| Varennes | No permit for parking of fewer than 9 spaces (except heritage homes or PIIA areas) | No permit for the house; widening the lowered curb is requested from Engineering, by appointment April 1 to October 15 | Done by specialized contractors at the owner’s cost: curb sawn or sidewalk rebuilt, April 15 to November 1, 15–20 business days after payment | Not specified on the City’s pages: the technologist tells you the applicable rule |
| La Prairie | No permit to change the surface of an existing house’s parking | Certificate of authorization required before widening the parking area | Not specified on the City’s page: confirm with the urban planning department | One access per street (two if the lot is over 20 m wide or on a corner); at most 3 m in front of the façade |
| Candiac | Simple same-size repaving: confirm with the City | Certificate of authorization to lay out parking or a curb cut (by-law 5005) | The certificate requires a plan locating the curbs and the curb cut | Not specified on the City’s pages |
| Saint-Constant | Not specified on the City’s pages: confirm under permits by-law 1531-17 | At most 3 m of driveway or parking in front of the house (outside the garage), unless approved under the PIIA; one access if the frontage is under 15 m | Not specified | Driveway 3–7 m one-way, 5–8 m two-way |
| Chambly | Not specified for same-size repaving | $20 permit « curb cut, laying out parking (enlargement or change) » | Curb lowered over the full width of the parking; any new access on Route 112 also needs the ministry’s approval | By frontage: 3 m (under 8 m), 5 m (8–12 m), 6 m (12–15 m), 7.5 m (15 m and more); the attached garage’s width if larger |
| Châteauguay | Not specified for simple same-size repaving | Permit required to build or enlarge parking (online request depending on whether there is a curb, a ditch or neither) | Curb-cut request to the inspection and permits division; no ditch closing where the ditch is under 1 m deep | Access at least 3 m; at most 50% of the frontage if the lot is 18.28 m or less, 9.14 m beyond |
We handle the paperwork with the City and schedule the curb cut before the paving. Each city page has the details.
Winter on the South Shore: 73.7 to 85 freeze-thaw days a year
| City | Climate station | Freeze-thaw days a year |
|---|---|---|
| Longueuil | Saint-Hubert | 85 |
| Brossard | Saint-Hubert | 85 |
| Boucherville | Saint-Hubert | 85 |
| Saint-Lambert | Saint-Hubert | 85 |
| Saint-Bruno-de-Montarville | Saint-Hubert | 85 |
| Sainte-Julie | Saint-Hubert | 85 |
| Varennes | Rivière-des-Prairies | 82 |
| La Prairie | Saint-Hubert | 85 |
| Candiac | Saint-Hubert | 85 |
| Saint-Constant | Montréal-Trudeau | 73.7 |
| Chambly | Saint-Hubert | 85 |
| Châteauguay | Montréal-Trudeau | 73.7 |
Every day the air temperature crosses zero can work water into the cracks. We hot-seal them before November and build the base in compacted stone layers so it doesn’t move in the thaw.
Tempo shelters on the South Shore: 2026–2027 dates
| City | Install from | Remove by | Permit |
|---|---|---|---|
| Longueuil | the last full weekend of October (October 24, 2026) | the second full weekend of April (April 10–11, 2027) | No |
| Brossard | November 1 | April 15 | No |
| Boucherville | October 15 | April 15 | Non mentionné |
| Saint-Bruno-de-Montarville | November 1 | April 15 | No |
| Sainte-Julie | October 15 | April 15 | No |
| Varennes | November 1 | April 15 | No |
| La Prairie | November 1 | April 1 | Non mentionné |
| Saint-Constant | October 15 | April 15 | No |
| Chambly | October 15 | April 15 | Non mentionné |
| Châteauguay | October 15 | April 30 | No |
We set up and anchor your shelter in the asphalt at your city’s setbacks: single $199, double $299, before taxes; $329 and $449 with spring removal. See Tempo shelter installation and our prices next to those published elsewhere.
Our services on the South Shore
- Asphalt driveway paving: fully rebuilt, widened or new driveways.
- Asphalt repair: cracks, potholes, sunken areas, edges.
- Sealcoating and resurfacing while the base still holds.
- Commercial and condo parking lots, in phases.
An asphalt project on the South Shore? Your price in 2 minutes
Frequently asked questions
How much does an asphalt driveway cost on the South Shore in 2026?
Fully rebuilt, about $6 to $10 per square foot before tax, or $2,400 to $4,000 for a 400 ft² double driveway. Resurfacing a sound base costs $3–5.50/ft² and sealcoating $265–300 up to 600 ft².
Do I need a permit to redo my driveway on the South Shore?
It depends on the city. Longueuil: not a listed trigger in the by-law (confirm with 311). Brossard: no certificate for a 1–3 dwelling home. Boucherville: no certificate for a house’s parking (only for multi-unit buildings, integrated projects or businesses). Saint-Lambert: a separate permit is required if you change the parking area. Saint-Bruno-de-Montarville: by-law URB-ADM2017 (s. 74) covers laying out or redoing parking: we check with the City whether a certificate applies. Sainte-Julie: no certificate for exterior work at an H1 or H2 house (except PIIA). Varennes: no permit for parking of fewer than 9 spaces (except heritage homes or PIIA areas). La Prairie: no permit to change the surface of an existing house’s parking. Candiac: simple same-size repaving: confirm with the City. Saint-Constant: not specified on the City’s pages: confirm under permits by-law 1531-17. Chambly: not specified for same-size repaving. Châteauguay: not specified for simple same-size repaving.
How many freeze-thaw days are there on the South Shore?
Between 73.7 and 85 a year depending on the nearest climate station, from Environment Canada climate normals: days when the air drops below 0 °C and back above. It is an air indicator, not a pavement measurement, but these cycles open unsealed cracks.
Which cities do you serve on the South Shore?
Longueuil, Brossard, Boucherville, Saint-Lambert, Saint-Bruno-de-Montarville, Sainte-Julie, Varennes, La Prairie, Candiac, Saint-Constant, Chambly and Châteauguay. For another municipality in the region, ask for a quote: we confirm quickly.
Sources
- Ville de Boucherville, Règlement de zonage 2018-290, chapitre 10 (tableaux 10.1 et 10.5)
- Ville de Boucherville, Règlement 2018-294 sur les permis et certificats (codification du 24 avril 2025)
- Ville de Boucherville, « Demande d’élargissement de l’accès terrain »
- Ville de Boucherville, « Abri d’auto temporaire (garage temporaire) »
- Ville de Saint-Lambert, formulaire « Demande de construction ou de modification d’une entrée charretière » (mis à jour le 23 septembre 2026)
- Ville de Saint-Lambert, Règlement de zonage 2024-215 (codification du 25 novembre 2025)
- Ville de Saint-Bruno-de-Montarville, Règlement de zonage URB-Z2017, chapitre 3, art. 135 (codification d’octobre 2026)
- Ville de Saint-Bruno-de-Montarville, Règlement URB-ADM2017 (codification du 7 août 2026)
- Ville de Saint-Bruno-de-Montarville, « Abris temporaires pour véhicule (résidentiel) et tambours »
- Ville de Sainte-Julie, Règlement de zonage 1101, art. 4.6.7 (version du 17 septembre 2026)
- Ville de Sainte-Julie, Règlement sur les permis et certificats 1104, art. 3.7.1.1
- Ville de Sainte-Julie, Règlement 1149-28, annexe A (tarification en vigueur le 1er juillet 2026)
- Ville de Varennes, « Requêtes de travaux » (coupe de bordure et reconstruction de trottoirs)
- Ville de Varennes, dépliant « Abri d’auto temporaire » (aide-mémoire des permis)
- Ville de La Prairie, « Règlements municipaux » (abri d’auto temporaire)
- Ville de Candiac, Règlement 5005 relatif aux permis et certificats, art. 57
- Ville de Candiac, Règlement 5000-069 (en vigueur le 5 novembre 2024)
- Ville de Saint-Constant, Règlement de zonage 1528-17, chapitre 5 (mise à jour du 1er mars 2021)
- Ville de Saint-Constant, avis public, projet de règlement 1921-26 (21 avril 2026)
- Ville de Saint-Constant, fiche « Installation d’un abri d’auto hivernal »
- Ville de Chambly, « Foire aux questions – Permis »
- Ville de Chambly, Règlement de zonage 2020-1431, chapitre 6 (tableau 6) et chapitre 5
- Ville de Châteauguay, Règlement de zonage Z-3001, chapitre 11, art. 11.2.2 (mise à jour du 2 juin 2026)
- Ville de Châteauguay, « Permis pour l’agrandissement ou l’aménagement d’un nouvel espace de stationnement (résidentiel) »
- Ville de Châteauguay, formulaire de demande de coupe de bordure
- Ville de Châteauguay, « Abri d’auto temporaire »
- Environment Canada climate normals (stations in the table)
- 2026 prices: asphalt paving prices
Pages checked October 26, 2026.
2026 prices in detail: sources and calculator.
Our services near you.

Asphalt driveway paving
A fully rebuilt driveway on a stone base compacted in layers.
$6–10/ft²

Asphalt repair
Hot-poured crack sealing, potholes, sunken areas, edges.
Based on damage and travel

Sealcoating
Protects the surface from water, salt and sun, and brings back the black.
Small driveway: $265–300

Asphalt resurfacing
A new layer of hot asphalt over a base that still holds.
$3–5.50/ft²

Commercial paving
Parking lots for businesses, buildings and condos, in phases.
On assessment

Excavation and foundation
Excavation, compacted MG-20 stone, drainage slopes.
Included in a rebuilt driveway

Tempo shelter installation
Set up, anchored in the asphalt and placed at your city’s distances.
Single $199, double $299

Tempo shelter removal
Cover and frame taken down and stored at your home, before your city’s deadline.
Single $149, double $199
Go further.

How much does an asphalt driveway cost in 2026?
Québec asphalt prices: rebuilding $6–10/ft², resurfacing $3–5.50, plus sealcoating and crack repair. Sources and a project budget calculator.
Read
Driveway permits: what 16 cities require (rules checked in 2026)
Repaving as is, gravel to asphalt, widening: what Laval, Terrebonne, Longueuil, Brossard and 12 other cities require. Widths, curb cuts, fees and deadlines.
Read
Asphalt paving across Québec.
The cities and regions where Pavabris paves, repairs and sealcoats asphalt: Montréal, Laval, the North and South Shores, Lanaudière and the rest of Québec, with one page per city.
ReadBefore the freeze, not next spring.
Describe your project in two minutes. We call you back quickly, come take a look and you get your price, free.