Before the snow: hot crack sealing, repairs and Tempo shelters, book now.

Off season: send photos and we tell you what is urgent and what can wait.

Season open: paving dates are booked in the order quotes are accepted.

After: Two-storey house at an October sunset, driveway replaced

Paving contractor · Montérégie

Asphalt paving in Montérégie.

Driveways, repairs, sealcoating and parking lots in Saint-Jean-sur-Richelieu, Granby, Saint-Hyacinthe, Beloeil, Mont-Saint-Hilaire, Sorel-Tracy, Vaudreuil-Dorion and Salaberry-de-Valleyfield. City rules change from one municipality to the next: here is, for each one, what it takes to redo or widen your driveway, and the 2026 price.

438 355-0636
  • Free quoteThe local crew confirmed first.
  • Clear priceEvery step spelled out in the quote.
  • Hot asphaltLaid with a paver, rolled.
  • Quick callbackThe owner, not a salesperson.

Updated October 29, 2026· Pavabris

On this page
  1. The cities in Montérégie
  2. Asphalt paving prices in Montérégie in 2026
  3. Redoing or widening a driveway: each city’s rules
  4. Winter in Montérégie: 74.1 to 84.5 freeze-thaw days a year
  5. Tempo shelters in Montérégie: 2026–2027 dates
  6. Our services in Montérégie
  7. Frequently asked questions
  8. Sources

The cities in Montérégie

Asphalt paving prices in Montérégie in 2026

Work 2026 prices (before tax) 400 ft² double driveway
Fully rebuilt driveway (excavation, base, asphalt) $6–10/ft² $2,400–4,000
Resurfacing over a sound base $3–5.50/ft² $1,200–2,200
Sealcoating $265–300 up to 600 ft² $265–300
Hot-poured crack sealing $250–400 below 200 linear feet depends on length

Calculate your price in 30 seconds or see all 2026 prices.

Your driveway in Montérégie: describe your project in 2 minutes

Redoing or widening a driveway: each city’s rules

City Redo the driveway at the same size Widen the driveway Curb cut Maximum width
Saint-Jean-sur-Richelieu No permit for a house’s parking area (only above 6 dwellings, for integrated projects or in a flood zone) No permit for a house; a curb or sidewalk cut is first arranged with the urban planning department Work in the street right-of-way governed by by-law 1799: request it from the City before paving; fee not published on the info sheet Curb cut 2.5–10 m (to confirm with urban planning); one per street if the lot is under 20 m wide; 5.5 m between two
Granby No permit to lay out a single-family house’s parking No permit for the house; the number and width of curb cuts apply Not specified on the City’s sheet: ask Public Works before paving At most two curb cuts per street, 9 m in total, 5 m apart (12 m on an unserviced lot 36 m wide or more)
Saint-Hyacinthe Not specified on the City’s pages; the City is replacing urban planning by-law 350 (zoning 850 adopted June 15, 2026): we check the rule in force To confirm with the urban planning department under the by-law in force Not specified Not specified for a house
Beloeil A « parking area and driveway » permit is on the City’s list of miscellaneous permits: confirm depending on the work Curb-cut request with the annotated certificate of location (existing and desired dimensions) After urban planning approves, Engineering measures and prices it; work by a City contractor, at the resident’s cost Curb cut 3–7 m (1–3 dwellings); one driveway if the frontage is under 40 m; 0.6 m landscaped along the side lot line
Mont-Saint-Hilaire Not specified on the permits page: confirm under administration by-law 1362 Curb-cut permit from the City; one entrance if the total frontage is under 25 m Not specified Curb cut 7 m at most (one-way driveway), 8 m (two-way); 6 m between two, 3 m from an intersection
Sorel-Tracy Not specified on the City’s pages: check with the urban planning department Check with the urban planning department Not specified Access and driveway 3–6 m for a 1–3 dwelling home
Vaudreuil-Dorion Certificate of authorization to lay out parking (by-law 1871, item 8) Same certificate to enlarge the parking Not specified: ask the City along with the certificate Not specified on the City’s pages
Salaberry-de-Valleyfield Not specified on the City’s pages: check with the urban planning and permits department Check with the urban planning and permits department (certificate depending on the work) Not specified Not specified on the City’s pages

We handle the paperwork with the City and schedule the curb cut before the paving. Each city page has the details.

Winter in Montérégie: 74.1 to 84.5 freeze-thaw days a year

City Climate station Freeze-thaw days a year
Saint-Jean-sur-Richelieu Iberville 79.3
Granby Granby 74.1
Saint-Hyacinthe Saint-Hyacinthe 2 77.4
Beloeil Sainte-Madeleine 82
Mont-Saint-Hilaire Sainte-Madeleine 82
Sorel-Tracy Sorel 76.8
Vaudreuil-Dorion Oka 84.5
Salaberry-de-Valleyfield Valleyfield 76

Every day the air temperature crosses zero can work water into the cracks. We hot-seal them before November and build the base in compacted stone layers so it doesn’t move in the thaw.

Tempo shelters in Montérégie: 2026–2027 dates

City Install from Remove by Permit
Saint-Jean-sur-Richelieu October 7 April 30 No
Granby October 1 April 15 No
Saint-Hyacinthe October 1 May 1 Non mentionné
Beloeil October 15 April 15 Non mentionné
Mont-Saint-Hilaire October 15 April 15 No
Sorel-Tracy October 1 April 30 Non mentionné
Vaudreuil-Dorion November 1 April 15 No
Salaberry-de-Valleyfield November 1 May 1 Non mentionné

Installation is confirmed with the crew available in your area, along with the price. See Tempo shelter installation and our prices next to those published elsewhere.

Our services in Montérégie

An asphalt project in Montérégie? Your price in 2 minutes

Frequently asked questions

How much does an asphalt driveway cost in Montérégie in 2026?

Fully rebuilt, about $6 to $10 per square foot before tax, or $2,400 to $4,000 for a 400 ft² double driveway. Resurfacing a sound base costs $3–5.50/ft² and sealcoating $265–300 up to 600 ft².

Do I need a permit to redo my driveway in Montérégie?

It depends on the city. Saint-Jean-sur-Richelieu: no permit for a house’s parking area (only above 6 dwellings, for integrated projects or in a flood zone). Granby: no permit to lay out a single-family house’s parking. Saint-Hyacinthe: not specified on the City’s pages; the City is replacing urban planning by-law 350 (zoning 850 adopted June 15, 2026): we check the rule in force. Beloeil: a « parking area and driveway » permit is on the City’s list of miscellaneous permits: confirm depending on the work. Mont-Saint-Hilaire: not specified on the permits page: confirm under administration by-law 1362. Sorel-Tracy: not specified on the City’s pages: check with the urban planning department. Vaudreuil-Dorion: certificate of authorization to lay out parking (by-law 1871, item 8). Salaberry-de-Valleyfield: not specified on the City’s pages: check with the urban planning and permits department.

How many freeze-thaw days are there in Montérégie?

Between 74.1 and 84.5 a year depending on the nearest climate station, from Environment Canada climate normals: days when the air drops below 0 °C and back above. It is an air indicator, not a pavement measurement, but these cycles open unsealed cracks.

Which cities do you serve in Montérégie?

Saint-Jean-sur-Richelieu, Granby, Saint-Hyacinthe, Beloeil, Mont-Saint-Hilaire, Sorel-Tracy, Vaudreuil-Dorion and Salaberry-de-Valleyfield, on assessment: each request first confirms the crew available in your area, then the scope and the price.

Sources

Pages checked October 26, 2026.

2026 prices in detail: sources and calculator.

Before the freeze, not next spring.

Describe your project in two minutes. We confirm the crew available in your area, then you get your price, free.

438 355-0636